Basement construction under existing 19th Century 3 storey building including the following activities:
- Strip out and removal of existing floor make up
- Structural reinforced concrete underpinning to existing foundations to depths of 3m
- Design and installation of temporary propping to existing property
- Design and installation of permanent structural steelwork
- Bulk excavation of basement
- Reinforced concrete basement slab construction
- Sump construction for drained cavity waterproofing system